Again the bush fires have been horrendous with Wilton being included in the 'at threat' suburbs. I hadn't heard from the new SS yet, so I contacted the CLO to get a rough idea of when the frame might go up. I was conscious that the fires would delay things, as Wilton was covered by a thick blanket of smoke. I was provided with the new SS's phone number and gave him a call. To my utmost shock, the SS said the frame was up! I contacted him at 11:30am and the frame was already up! Unbelievable!
We attempted to get out to the block about 4pm but could not get through due to road closures. We came back a few hours later and the road was open. We were so surprised to see the roof trusses were up as well! After looking just at the slab and thinking it looked quite small, the frame really changed our opinions. Our bedroom looked so big and we can't wait to use our WIR's! There were still a few peices of the frame that needed to be put up and then it's straight into plumbing, bricks and roof!! Bring it on!
No comments:
Post a Comment